Close Menu
PAD MagazinePAD Magazine
    Pages
    • About PAD Magazine
    • Advertise
    • Contact
    • Contribute Property and Home Improvement related content
    • Home
    • Newsletter Advertising
    • Pad Team
    • Property & Development Magazine
    • Subscribe
    Facebook X (Twitter) Instagram
    • Contribute
    • About PAD Magazine
    • Pad Team
    X (Twitter) RSS
    PAD MagazinePAD Magazine
    • Home
    • New Builds
      • Sales & Marketing
      • Regeneration
      • Planning & Design
      • Sustainable Construction
    • Luxury Living
      • Interior Design
      • Lifestyle
      • Property Renovation & Refurbishment
      • Garden & Lanscaping
      • Home Decor
    • News
      • Software
      • Energy & Utilities
      • Affordable Housing
      • Environment
      • Plant & Machinery
      • Products & Materials
      • Infrastructure & Energy
    • About
      • Pad Team
      • Contribute Property and Home Improvement related content
    • Contact
    Subscribe
    PAD MagazinePAD Magazine
    You are at:Home Bespoke Kitchens for Grainger Build-to-Rent Scheme in Birmingham
    Products & Materials

    Bespoke Kitchens for Grainger Build-to-Rent Scheme in Birmingham

    Cristina DiaconuBy Cristina Diaconu16/05/2022No Comments3 Mins Read0 Views
    Facebook Twitter Pinterest Telegram LinkedIn Tumblr Email Reddit
    Bespoke Kitchens for Grainger Build-to-Rent Scheme in Birmingham
    Share
    Facebook Twitter LinkedIn Pinterest WhatsApp Email

    Deanestor, one of the UK’s leading furniture and fitout specialists to the build-to-rent sector, has completed a contract to provide bespoke, contemporary kitchens for a new Grainger scheme in Birmingham’s Jewellery Quarter.

    Awarded by main contractor Clegg Construction, the contract for Gilder’s Yard was for 158 high specification kitchens which were manufactured and installed by UK-based Deanestor.

    Developed for Grainger plc – the UK’s largest listed residential landlord, Gilder’s Yard comprises the renovation of a three-storey Grade II listed former jewellery factory and the construction of three further blocks to provide high quality one- and two-bedroom apartments for rent, and 10,000sqft of commercial space on the ground floor. The scheme was designed by BPN Architects.

    There were three kitchen configurations – island, L-shaped and single wall – and two colour palettes for the cabinets – platinum white and graphite grey, both with white quartz worktops and contrasting stainless steel handles.

    The ‘loft’ finish and open plan island kitchen layout were developed for the apartments in the listed building with the dark grey units designed to complement the exposed brickwork and surfaces.

    According to Josh Barker, Development Manager at Grainger, “This was a complex regeneration project which is breathing new life into a historic building in Birmingham’s thriving Jewellery Quarter. Gilder’s Yard will provide much needed high quality, contemporary homes for rent which incorporate traditional heritage features of the site.”

    “We recognise the importance of quality, durable kitchens that are designed to meet the requirements of our residents, and we are pleased that the Deanestor team helped us to achieve this at Gilder’s Yard.”

    See also  MSCI Inc Offers Their Expertise Worldwide

    Tim Croft, Project Manager for Clegg Construction, said “The interior design of this scheme was a prominent part of the architecture and was designed to complement the retained exterior which has large picture windows that increase visibility of the internal features such as the kitchens. The new build wings are a modern interpretation of the listed elevation in fenestration and materials.”

    “We were confident in Deanestor’s ability to deliver the quality required for the project and in a short timeframe. Their design team performed well with a good level of detailing and technical expertise. They were able to accommodate variations in layout whilst achieving as much standardisation for manufacturing efficiency as possible. The kitchens have been finished to a high standard.”

    Deanestor supplied and installed integrated appliances for each kitchen – tall fridge freezer, dishwasher, electric hob, and built-in oven. There is also a freestanding washer dryer and a ceiling-mounted extractor, with pull-up, down draught extractors for the island kitchens.

    Deanestor works for some of the UK’s leading private residential developers on major schemes, offering bespoke joinery and fitout for high specification kitchens and bedroom furniture.

    Built to last, cabinets are crafted using robust glue and dowel constructions. There is a wide choice of contemporary materials, finishes and colours, including gloss or matt, vinyl or laminate finishes, integrated appliances, and worktops such as laminates, marble, granite, quartz, and solid surface materials. These are installed by Deanestor’s site teams ready for M&E connections as part of the FF&E package for a full turnkey service.

    Property & Development Magazine | The Home of Residential Sector News

    See also  Ecoscape Launches Environmentally Friendly Outdoor Kitchen Range
    cleggconstruction deanestor furniture kitchen
    Share. Facebook Twitter Pinterest LinkedIn Reddit WhatsApp Telegram Email
    Previous ArticleLife made simple with a Rotpunkt kitchen, designed by Zen Kuchen
    Next Article Topping out Ceremony Marks Key Milestone for Bristol Dockyard Project
    Avatar
    Cristina Diaconu

    Related Posts

    JB Furniture Launches the Conrad Collection – Sophisticated Outdoor Style for All Seasons

    04/06/2025

    Gleeds named one of the UK’s Best Workplaces for Development™

    30/05/2025

    Call for action as survey reveals 35% of homes with spray foam have defect

    20/05/2025

    Comments are closed.

    Search
    Categories
    • Affordable Housing
    • AI
    • Architecture
    • Art & Entertainment
    • Automotive
    • Awards
    • Beauty
    • Builds & Development
    • Business, Legal & Financial
    • Casino
    • Celebrities
    • Charity
    • Construction
    • Coronavirus
    • Corporate Social Responsibility
    • Crypto
    • Energy
    • Energy & Utilities
    • Environment
    • Events
    • Fashion
    • Finance
    • Gambling
    • Garden & Lanscaping
    • Health
    • Home Decor
    • Homes and Interiors
    • Infrastructure & Energy
    • Interior Design
    • International
    • Jobs & Training
    • Law
    • Leisure & Hospitality
    • Lifestyle
    • Luxury Living
    • Management & Estate Services
    • Manufacturing
    • Marketing
    • Medical
    • Net Worth
    • News
    • Op-Ed
    • Planning & Design
    • Plant & Machinery
    • Plumbing
    • Press Releases
    • Products & Materials
    • Property Renovation & Refurbishment
    • Regeneration
    • Sales & Marketing
    • Software
    • Sustainable Construction
    • Technologies
    • Tips
    • Tips
    • Travel & Tourism

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    Representatives from UK’s flagship high streets call for urgent action on safer high streets – warning Government promises risk falling short 

    Humber Freeport showcases investment momentum at UKREiiF 2025

    What to Expect Before, During, and After a Dental Implant Procedure

    Grosvenor announces strong financial, social and environmental performance, turning focus on investment and growth

    Representatives from UK’s flagship high streets call for urgent action on safer high streets – warning Government promises risk falling short 

    Humber Freeport showcases investment momentum at UKREiiF 2025

    What to Expect Before, During, and After a Dental Implant Procedure

    Grosvenor announces strong financial, social and environmental performance, turning focus on investment and growth

    © 2025 ThemeSphere. Designed by Property & development.

    Type above and press Enter to search. Press Esc to cancel.

    Manage Cookie Consent
    To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behaviour or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
    Functional Always active
    The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
    Preferences
    The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
    Statistics
    The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
    Marketing
    The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
    Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
    View preferences
    {title} {title} {title}